CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
29
Figure 3.8 Headworks arangement of the 500kw Jhankre mini-hydro scheme, Nepal. Note that the intake, setting basin and the forebay are
one combined structure and there is no headrace. The topography is such that a penstock alingment could be started right at the
headworks.