GRAVITY GOODS ROPEWAY
11 Gabion work
2x1x1
4
B)
Bottom
station
1 Site clearance
2 Earth work in excavation
Anchorage block
Front wall
RCC pillar (Left)
RCC pillar (Right)
Post foundation
Side walls foundation
Back wall
Sheave anchorage
Gabion work
1 3.20
1 5.36
1 1.4
1 1.4
4 0.90
1 7.49
1 4.90
1 3.10
1 4.00
3 Rubble stone masonary(1:6)
Anchorage block
Long wall - front
1 4.90
Long wall - back
1 3.20
Short wall
2 1.50
Main
Front wall
1 4.90
Deduction
Front wall
1 4.40
side walls
2 7.49
Pillar
2 1.40
Post 8 0.96
Sheave anchorage
Long wall
2 3.10
Short wall
2 0.90
Deduction
Post 8 0.96
4 PCC for RCC work (1:2:4)
Piller
Piller basement
Post
Anchorage post
Sheave anchorage
Floor
2 0.45
2 1.40
8 0.30
2 1.80
2 0.40
1 6.00
82
4 no
26.00 m²
m³
5.63 18.02
0.69 3.70
1.4 1.1 2.156
0.44 0.616
0.90 1.20 3.888
0.50 1.00 3.745
0.50 2.70 6.615
1.50 0.81 3.7665
0.50 2
44.50
m³
0.50 1.75 4.29
0.30 1.80 1.73
0.30 1.80 1.62
0.00
0.50 0.90 2.21
0.50 0.45 0.99
0.50 0.93 6.97
0.45 0.80 1.01
0.96 0.32 2.36
0.30 0.80 1.49
0.30 0.80 0.43
0.11 -0.87
Total
22.21
m³
0.45 2.90 1.17
1.40 0.20 0.78
0.30 0.60 0.43
0.13 0.45
1.10 0.70 0.62
3.90 0.08 1.87