Annex 3
2.3 Wire ropes and steel parts
By Truck
By Porter
2.4
Additional haulage distance
From
To
Metalled road
Non metalled road
From
To
Portering days
Sand
Rubble, Boulders
Block stone
Gravel
Natural gravel available
Chitwan
Bhaludhunga
0.00
27.00
0.00
m 100.00
m 100.00
m
m 25.00
% 50.00
3 OFFICIAL RATE FOR FY 2009/10
Fiscal year
3.1 Labour rate
S.No.
Type Unit Rate,NRs.
1
Skilled labour
1
manday
320.00
2
Unskilled labour
1
manday
190.00
3
Carpenter, Mason
1
manday
320.00
4
Portering from lower station
to upper
kg
2.50
3.2 Materials
Description
Unit Rates
3.3 Transportation by truck (equip. & mat.)
Transporatation from Damauli to
Bhaludhunga
per kg 1.50
Transportation by porter (equip. & mat.)
Transporatation from bato to site
per kg
Transportation by truck (wire rope and non
local materials )
Transportation from Chitwan to Site
1.00
Transportation by porter (wire rope)
Transporatation from to
1.50
Transportation by truck (Black topped)
per kg 0.02
Transportation by truck (Gravelled)
per kg/
km
0.04
Tata mobile (from Chitwan)
per trip 8,000.00
Tata mobile (from Chitwan)
per trip 6,000.00
3.4 Construction of gabions
Gabion Wire, 7,10,12 SWG
kg 95.00
3.5
Concrete & masonry works all other civil
work
2009/10
RateVAT
107.35
93