GRAVITY GOODS ROPEWAY
4.3. Goods transported (exported) outside to the influence area
Months
Name of goods
Approximate
quantity/month
Mode of transport
Per kg rate of
transport
Remarks
4.4. Travel time
Mode of transport
Travel time (Village to road)
Laden
Un-laden
Road to village
Laden
Un-laden
4.5. Name of the nearest road (from bottom station):
4.5.1. Class of road: National highway District road Village road
4.5.2. Category of Road: Black topped Gravel Earthen
4.6. If the village is already not connected by road network, is there any possibility of road extension
network or other type of transportation within five years ?
(N.B: Refer District Transport Master Plan of the district and make inquiry with the local government (DDC,
VDC) and local dignitaries to know about the road extension plan)
4.7. Describe the general difficulties associated with the current mode of transportation system and
facilities (e.g. not sufficient to cope with demand, operational problems , risky, time consuming, costly,
service not guaranteed etc)
4.8. Expected change/improvement in the transportation status due to the intervention of gravity ropeway
in the project area?
64