Spill response and containment efforts
Contents
Data on Deepwater Horizon response and containment efforts
Data on the Deepwater Horizon main page
Department of Energy data
The following documents are a collection of data from operations to control flow from the Deepwater Horizon well. All information was provided directly by BP.
Description of the System
The following document gives a general overview of the well, the blow out preventer, the lower marine reservoir package and the riser configuration as best known after the April 20 fire on the Deepwater Horizon.
- Well Configuration (.pdf)- showing the depths and sizes of the different casings installed during the well's construction. - {Download }
Timeline of Key Events
This document summarizes the key events, including operations such as the kill attempt, the cutting of the riser, and recovery of hydrocarbons at the surface.
- Key Events Timeline (.xls) - This document lists key events beginning with the April 20 fire on the Deepwater Horizon through July 28th. Updated July 28, 2010. - {Download }
Containment System
The following documents describe the short and medium term containment and collection efforts that have been implemented. It also includes data from surface collection efforts to date.
- Subsystem Configuration Containment Logistics, End June (.jpg) - This is a diagram prepared by BP to show the surface and subsea equipment deployed to collect hydrocarbons at the end of June. - {Download }* Subsystem Configurations Containment Logistics, Mid-July (.jpg) - This is a diagram prepared by BP to show the surface and subsea equipment deployed to collect hydrocarbons in mid July. - {Download }
- RFI Well Integrity July 6, 2010 (.ppt) - This PowerPoint report entitled "Well Integrity During Shut - In Operations: DOE/DOI Analyses" describes risks and suggests risk management recommendations associated with shutting in the well. - {Download }* Top Hat 4, June 2, 2010 (.pdf) - These are computer-aided drawings of Top Hat #4, a piece of equipment which was installed over the flowing well after the riser was removed. This device captured hydrocarbons so that they could be collected at the sea surface. - {Download }* Top Hat Pressure System Hyperbaric Test Analysis (.xlsx)- This file contains data from pressure measurements inside Top Hat #4. - {Download }* Riser Insertion Tube Tool Description (.pdf) - This graphical image shows the layout and configuration of the device used to first collect hydrocarbons from the broken riser lying on the sea floor. - {Download }* Lower Marine Riser Package - {Download }* Lower Marine Riser Package - {Download }* Deepwater Horizon Containment (.pdf) - This file details plans for future oil containment during the sealing cap operation and also display the associated relief well operation. - {Download }* Enterprise Top Hat Phases (.pdf) - This file details contigency plans in the event a top hat device needs to be used for oil collection. - {Download }
BOP Stack Details
These documents provide information about a number of the key components of the system: the Blow Out Preventer, the Lower Marine Riser Package, and the associated piping which is located above the wellhead on the sea floor.
- BOP Pressures, June 7, 2010 (.xls) - This is a schematic of the BOP stack with the static pressure data recoded on the 25th of May. - {Download }* Pressure Data: BOP Summary May 28, 2010 (.xls) - This is a schematic of the BOP stack with the static pressure data recoded on the 28th of May and shows pressures before and after the attempted top kill and junk shots. - {Download }* Blow Out Preventer Drawing (.pdf) - This file is an engineering drawing of the Blow Out Preventer with the key components labeled. - {Download }* Pressure Data Within BOP (.xls) (.ods) - This file describes the components within the BOP and the pressure readings taken during diagnostic operations on May 25. [../../../files/155901_156000/155926/bop_pressures_25_may.ods ] - {Download }
Top Kill Operations
This document provides detailed information on the top kill process (conducted in late May) and results.
- Top Kill Operational Concept and Status (.pdf) - This file contains a cartoon schematic of the Top Kill operational concept and layout of surface and underwater vessels and a status of Top Kill #1 - 3. - {Download }