Appendix C: Labour
This is meant as an approximate guide only. Some jobs require at least two
people. It assumes all materials have been procured.
Job
Total for mould manufacture
Cut fibre glass mat
Lay-up blade half - 6 required: 3 x windward, 3 x backward
Stringer attachement and blade half joining
Foam insertion
Balde finishing
Total for blade set (3 blades) (assume moulds created)
Approx Man-days
10 man-days
1
5
1
1
2
10 man-days
37